Refine
Year of publication
- 2007 (4) (remove)
Document Type
- Preprint (4)
Language
- English (4)
Has Fulltext
- yes (4)
Keywords
- Algorithmics (1)
- Gauge Distances (1)
- Location Theory (1)
- Machine Scheduling (1)
- cut basis problem (1)
- graph and network algorithm (1)
- hub location (1)
- integer programming (1)
- inverse problems (1)
- minimum cost flows (1)
Faculty / Organisational entity
Given a directed graph G = (N,A) with arc capacities u and a minimum cost flow problem defined on G, the capacity inverse minimum cost flow problem is to find a new capacity vector u' for the arc set A such that a given feasible flow x' is optimal with respect to the modified capacities. Among all capacity vectors u' satisfying this condition, we would like to find one with minimum ||u' - u|| value. We consider two distance measures for ||u' - u||, rectilinear and Chebyshev distances. By reduction from the feedback arc set problem we show that the capacity inverse minimum cost flow problem is NP-hard in the rectilinear case. On the other hand, it is polynomially solvable by a greedy algorithm for the Chebyshev norm. In the latter case we propose a heuristic for the bicriteria problem, where we minimize among all optimal solutions the number of affected arcs. We also present computational results for this heuristic.
Given an undirected, connected network G = (V,E) with weights on the edges, the cut basis problem is asking for a maximal number of linear independent cuts such that the sum of the cut weights is minimized. Surprisingly, this problem has not attained as much attention as its graph theoretic counterpart, the cycle basis problem. We consider two versions of the problem, the unconstrained and the fundamental cut basis problem. For the unconstrained case, where the cuts in the basis can be of an arbitrary kind, the problem can be written as a multiterminal network flow problem and is thus solvable in strongly polynomial time. The complexity of this algorithm improves the complexity of the best algorithms for the cycle basis problem, such that it is preferable for cycle basis problems in planar graphs. In contrast, the fundamental cut basis problem, where all cuts in the basis are obtained by deleting an edge, each, from a spanning tree T is shown to be NP-hard. We present heuristics, integer programming formulations and summarize first experiences with numerical tests.
In contrast to p-hub problems with a summation objective (p-hub median), minmax hub problems (p-hub center) have not attained much attention in the literature. In this paper, we give a polyhedral analysis of the uncapacitated single allocation p-hub center problem (USApHCP). The analysis will be based on a radius formulation which currently yields the most efficient solution procedures. We show which of the valid inequalities in this formulation are facet-defining and present non-elementary classes of facets, for which we propose separation problems. A major part in our argumentation will be the close connection between polytopes of the USApHCP and the uncapacitated p-facility location (pUFL). Hence, the new classes of facets can also be used to improve pUFL formulations.
While in classical scheduling theory the locations of machines are assumed to be fixed we will show how to tackle location and scheduling problems simultaneously. Obviously, this integrated approach enhances the modeling power of scheduling for various real-life problems. In this paper, we present in an exemplary way theory and a solution algorithm for a specific type of a scheduling and a rather general, planar location problem, respectively. More general results and a report on numerical tests will be presented in a subsequent paper.